Radio remote control and automation projects.

45 Ton Shunting Hunslet locomotive.

This project was concluded at a mining smelter as a cost saving measure. Where previously two personal where required for the work.

After installation one operator could operate the locomotive from inside or via radio remote.

The radio remote control was designed supplied and installed with a control panel which interfaced with train electrical and pneumatic systems. Full safety requirements where integrated including vigilance loco brake and train brake and was fully operational from radio remote control.

 

Train jack automation.